Pan-African Infrastructure Platform

Africa's next infrastructure backbone is being built now.

InfraNovaGlobal originates, structures and delivers sovereign-grade digital and power infrastructure across the African continent, subsea and terrestrial connectivity, AGI-ready data center platforms, and independent power generation. Ring-fenced. Institutionally governed. Built to be bankable.

Phase 1 is now kicking off, the submarine and terrestrial cable backbone across the Horn of Africa, together with the first three data centers at Cato Ridge, Colesberg and Kazungula.

770 MW
Power Platform Planned
~25,000 km
AAE-2 Cable System
130M+
People Reached
US$35M
Series A, Live Now
The Thesis

The world has run out of places to put compute. Africa has not.

Hyperscale demand is colliding with a global power ceiling. Virginia, Frankfurt and Singapore have run out of headroom. What is scarce is not silicon. It is power, land, and sovereign-grade connectivity in the same place at the same time.

InfraNovaGlobal exists to assemble those three inputs into deliverable, financeable infrastructure. We do not wait for the grid. We build generation, we build the fiber that binds it, and we govern each vertical as a separate, independently financeable vehicle so that capital can be deployed with precision and without contamination between risks.

What We Are Building

Four businesses. One integrated platform.

Telecoms, digital backbone, data centers and energy, four distinct operating businesses that reinforce one another, each housed in its own ring-fenced vehicle with its own capital structure and data room, and no cross-collateralization between them.

Telecoms & Connectivity

Wholesale capacity & carrier services

The commercial layer of the network. We sell capacity, transit and long-term IRUs to carriers, ISPs, governments and hyperscalers, and colocation at our cable landing stations, one contract and one SLA across every major system reaching the continent.

  • Wholesale capacity, transit & IRUs
  • Landing-station colocation & cloud on-ramps
  • Aggregator across G2A, PEACE, 2Africa, SEACOM 2.0, DARE1 & AAE-2
InfraMoyaGlobal · digital lane · Explore Telecoms →
Digital Backbone

Subsea & terrestrial fiber spine

The physical network beneath the services, subsea participation plus a terrestrial fiber spine binding Africa's principal markets. A second, independent path where the majority of regional traffic depends on a single route today.

  • AAE-2 trunk + two Horn of Africa branches
  • 1,600 km operating Berbera–Addis backbone
  • ~25,000 km reach · 100+ Tbps design capacity
InfraMoyaGlobal · digital lane
Data Centers

AI-ready hyperscale campuses

Tier III+/IV campuses at Cato Ridge, Colesberg and Kazungula, sized to contracted demand and powered behind the fence, so compute never waits on an unstable grid. Built to hyperscaler specification, de-risked before construction.

  • 100 MW critical load, phased over 5–7 years
  • Behind-the-fence hybrid power · 99.999% design target
  • Closed-loop cooling · fiber-redundant by design
InfraMoyaGlobal · with InfraMoyaEnergy power
Energy

Independent power & gas-to-power

A planned 770 MW gas-to-power platform in Mozambique, behind-the-fence microgrids purpose-built for critical digital load, and an upstream gas ambition to own the fuel chain end to end.

  • Ressano Garcia 120 MW, Stage 1, live
  • Dondo 450 MW · Beira 200 MW, 770 MW planned
  • Solar + gas + battery microgrids · upstream gas JV sought
InfraNovaEnergy · with InfraMoyaEnergy

A fifth vehicle, InfraMoyaOrbital, holds orbital compute and space-adjacent infrastructure as an asset-light aerospace joint venture, a forward option, developed distinctly from the four core businesses and not a Phase 1 dependency.

Layer 01 · Phase 1 · NowConnectivity
Subsea and terrestrial fiber across the Horn of Africa, cable landing infrastructure and gateway access, the aggregator across every cable pillar: G2A, PEACE, 2Africa, SEACOM 2.0, DARE1 and AAE-2. One contract, one SLA, one interface.
InfraMoyaGlobal
Kicking off now
Layer 02 · Phase 2Data Centers
AI-ready hyperscale campuses at Cato Ridge, Colesberg and Kazungula, built to Tier III standard and sized to contracted demand. De-risked by the Series A, built once shovel-ready.
InfraMoyaGlobal
De-risking now
Layer 03 · Phase 3Power
Independent power production in Mozambique, a planned 770 MW platform beginning with Ressano Garcia, alongside behind-the-fence solar, gas and battery microgrids purpose-built for critical digital load.
InfraNovaEnergy
InfraMoyaEnergy
Layer 04 · Phase 4Orbital
Orbital compute and space-adjacent digital infrastructure developed as a separate, asset-light venture with an aerospace joint venture partner. A forward option, not a Phase 1 dependency.
InfraMoyaOrbital
Forward option
InfraNovaGlobal
InfraNovaGlobalGroup holding · origination & structuring
InfraMoyaGlobal
InfraMoyaGlobalDigital · connectivity & data centers
InfraNovaEnergy
InfraNovaEnergyPower · independent generation
Capital Formation

Three separate, ring-fenced raises.

Each raise sits in its own vehicle with its own security and its own data room. Subscription to one does not imply participation in another.

01 · InfraMoyaGlobal · Equity · Live

US$35M, Series A

US$25M telecoms backbone plus US$10M data centers. Carries Phase 1 from an advanced, contracted plan to shovel-ready and bankable, ahead of the US$78M Phase 1 financial close.

  • Backbone de-risking, Addis → Berbera → Salalah
  • Site control and FEED for DC1–DC3
  • First close targeted Q4 2026
02 · InfraMoyaGlobal · Two-Vehicle

US$250M, AAE-2 Program

US$150M ring-fenced branch SPV for the Ethiopia–Berbera–Salalah submarine branch, plus US$100M AAE-2 consortium participation for one fiber pair minimum and Management Committee governance rights.

  • Vehicle 1, US$150M branch system
  • Vehicle 2, US$100M consortium rights
  • Funder LOI targeted August 15, 2026
03 · InfraNovaEnergy · Project Finance

US$235M, Ressano Garcia

Total funding requirement for the 120 MW gas-to-power IPP: US$140M senior debt, US$60M equity, US$10.6M pre-funded DSRA, plus subordinated development debt and pre-financial-close development capital.

  • US$140M senior, TDB lead, IFC/DBSA co-lender
  • Financial close targeted Q1 2027
  • Commercial operation Q2 2028
AAE-2 · Asia–Africa–Europe 2 Submarine Cable System
Salalah → Berbera → Addis Ababa · bypassing the Djibouti chokepoint
AAE-2 submarine cable network map showing routes connecting Asia, Africa and Europe
Ring-Fenced Opportunities

Three distinct mandates, each independently financeable.

Each opportunity below sits in its own vehicle with its own data room. Commercial terms are disclosed under NDA to qualified institutional counterparties.

InfraMoyaGlobal · Opportunity 01

Pan-African Digital Backbone & AGI-Ready Data Center Platform

Terrestrial fiber binding the continent's major markets, anchored by three hyperscale data center campuses, Cato Ridge (KZN), Colesberg (South Africa) and Kazungula (Botswana), designed for hyperscaler anchor tenancy, sovereign data governance, and behind-the-fence power independence.

Campus capacity is phased over 5–7 years toward 100 MW of critical load, beginning with a core pod and regional edge presence, expanding into multi-availability-zone AI and machine-learning workloads.

Ring-fenced vehicle · independent data room · no cross-collateralization
InfraMoyaGlobal · Opportunity 02

AAE-2 Trunk Participation & Horn of Africa Branches

Participation in the AAE-2 consortium trunk together with two dedicated branches into the Horn of Africa, a route that carries traffic for a market of over 130 million people while removing dependence on the single backbone most regional capacity currently relies upon.

Landing infrastructure at Berbera, extending inland over an existing 1,600 km terrestrial backbone to Addis Ababa, an operating fiber asset, not a greenfield build.

~25,000 km
System Length
100+ Tbps
Design Capacity
<15 ms
Regional Latency
1,600 km
Terrestrial Extension
InfraNovaEnergy · Opportunity 03

Ressano Garcia 120 MW Gas-to-Power

Stage 1 of a planned 770 MW Mozambican independent power platform, sited at one of sub-Saharan Africa's most de-risked energy nodes, with established gas supply, precedent power purchase agreements at the same node, and dual-market offtake into both the domestic grid and regional export.

Followed by Dondo (450 MW) and Beira (200 MW). Separately, InfraNovaEnergy is pursuing a joint venture to secure rights over specified Mozambican gas blocks, and is seeking an appropriate mid- and upstream partner.

120 MW
Stage 1 Nameplate
770 MW
Platform Planned
25 yrs
PPA Tenor
400 kV
Regional Export Link
Delivery Sequence

A staged rollout, not a promise.

Each phase is gated on the one before it. Capital is deployed against milestones, not ambition.

Phase 01 · Foundation

Structure & Rights

Vehicles established, joint ventures documented, route and site rights secured, consortium participation advanced.

Phase 02 · Anchor, live

First Capital & Anchor Offtake

Series A in market to de-risk the backbone and the first three campuses; power offtake advanced toward definitive documentation.

Phase 03 · Build

Construction & Commissioning

Landing infrastructure, terrestrial extension, Stage 1 generation, and initial data center pod delivered.

Phase 04 · Scale

Platform Expansion

Multi-zone campus expansion, Dondo and Beira generation, and long-term institutional refinancing.

Institutional Engagement

Commercial terms are shared under NDA.

We engage with development finance institutions, export credit agencies, infrastructure funds, hyperscalers and strategic partners. Detailed commercial information, capital structures and data room access are released to qualified counterparties following screening.